How a lift is installed: the steps, in order
What happens between signing the order and riding the lift, and what your building must have ready.
- Site survey. We measure the shaft, pit depth, overhead height and machine room, and agree the capacity, speed and number of stops.
- Drawings and order. You approve the layout drawing and choose the cabin, door, ceiling, floor and handrail designs. The lift is then ordered from the factory.
- Civil work by the building. While the lift ships, your contractor finishes the shaft plaster, pit waterproofing, machine room slab and hoisting hook, and provides three-phase power to the machine room.
- Scaffolding and rails. Brackets are anchored to the shaft wall and the guide rails are aligned from pit to top.
- Machine and controller. The traction machine, speed governor and control panel are set in the machine room (or at the shaft head for a machine-room-less lift).
- Car and counterweight. The car frame, platform and counterweight are assembled in the shaft and roped.
- Doors. Landing doors are fitted on every floor, then the car door and operator.
- Wiring. Travelling cable, shaft wiring, call buttons, limit switches and safety circuits.
- Testing and commissioning. Slow-speed run, levelling, load test, safety gear and buffer tests.
- Handover. We train your caretaker and start the maintenance period.
How long it takes depends on the number of stops and how ready the shaft is. Ask us for a schedule for your building.